HYSY 291 | ||||
|
||||
Type: deepwater trenching multipurpose vessel Classification Society: CCS & DNV Length overall: 109.5m Molded breadth: 24m Molded depth: 9.8m Maximum draught: 7.8m Bollard pull: 361 T Main crane: 250 T Capacity: equipped with two work class ROVs with an operating depth of 3,000m, the vessel is used for deepwater trench-ploughing and mooring systems installation etc., Main projects: 2016: installation of submarine pipeline protective frames for Liwan 3-1 Project. 2017: installation of mooring system and hoses of the FPSO unit for the Malaysia project. 2018: replacement of mooring lines of Liuhua FPSO vessel “NAN HAI SHENG LI”. 2019: pre-laying of deepwater mooring system of the “HYSY 119” FPSO vessel. 2020: pre-laying and tieback of the mooring system for “Deep Sea No. 1” Large Gas Field Project. 2022: sea trial of a deepwater plough trencher. |
||||
|
||||