HYSY285/287 | ||||
|
||||
HYSY 285 Type: saturation diving support vessel Classification Society: CCS Length overall: 125.75m Molded breadth: 25m Molded depth: 10.8m Maximum draught: 7.7m Main crane: 250 T Capacity: HYSY 285 is equipped with DP3 dynamic positioning system and one NOV 250 T crane with active heave compensation and two 200 HP work class ROVs. It can perform underwater wellhead maintenance, well completion/workover/killing supports, underwater well abandonment, route check, underwater testing/maintenance/repair, laying of submarine pipelines and cables, ROV and saturation diving supports and other operations at 3,000m depth. Main projects: 2018: Wenchang 9-2/9-3/10-3 Gas Fields Development Project. 2019: installation of Christmas trees in Liuhua Work Area; pre-commissioning of submarine pipelines; measurement of jumpers and installation of flying leads and suction piles for Lingshui 17-2 Gas Field Development Project. 2022: laying of cables in Changle Work Area. HYSY 287 Type: multi-purpose offshore vessel Classification Society: CCS & DNV Length overall:125.75m Molded breadth: 25m Molded depth: 10.8m Maximum draught: 7.7m Main crane: 250 T Capacity: HYSY 287 is equipped with DP3 dynamic positioning system, one NOV 250 T crane with active heave compensation and two 250 HP work class ROVs. It can perform underwater wellhead maintenance, well completion/workover/killing supports, underwater well abandonment, route check, underwater testing/maintenance/repair, laying of submarine pipelines and cables, post trenching, ROV and saturation diving supports and other operations at 3,000m depth. Main projects: 2018: saturation diving support for Dongfang 13-2 Project. 2019: operation area pre-survey, placement of concrete blocks at intersections between subsea manifolds, block LBL arrangement, monitoring of submarine pipe-mud contacts, joint commissioning of subsea structures and other operations for Liuhua 29-1 EPCI Project. 2020: installation of jumpers, laying of umbilicals, lifting and positioning of subsea structures, laying of submarine pipelines and other operations for Liuhua 16-2 Oilfield Development Project. 2020: lifting of suction piles and jumpers, laying of electrical/hydraulic flying leads, route check, subsea wellhead testing and other operations for Lingshui 17-2 Gas Field Development Project. 2021: trenching for Liuhua 19-5 Gas Field Subsea Production Facility Protection Project and Lufeng Oilfields Regional Development Project. 2022: laying of 35 kV submarine cables and shallow water post trenching for 220 kV submarine cables for Yangjiang Qingzhou III Offshore Wind Farm. |
||||
|
||||