Crane and pipe-laying equipment

BLUE WHALE

Type: self-propelled, anchor mooring crane vessel with unlimited navigation area

Classification: ABS

Length overall: 241m

Molded breadth: 50m

Molded depth: 20.4m

Maximum draught: 13.4m

Main crane: 7,500 T

Capacity: equipped with one 10,143 kW main engine and 10 working windlasses, Lanjing is a self-propelled crane vessel with up to 7500 T lifting capacity and mooring systems positioning.

Main projects 

2008: lifting of the 4,993 T topside module for Ledong Project ; lifting of the10,602 T topside module for India VED Project.

2009: lifting of the 9,106 T topside module for Bozhong 28-2S Module Project; lifting of the 4,500 T for Qatar Maersk GA Wellhead Deck Installation Project.

2012: lifting of module with a total weight of 15,110 tons for Panyu 5-1 Project;jacket installation of Liwan 3-1 project.

2013: lifting of module with a total weight of 30,472 tons for Suizhong 36-1 Oilfield Adjustment Phase II Project.

2014: lifting of module for Panyu 10-2WHPA;lifting of the 15,100 T module for Saudi Arabia WASIT Project.

2015: centralizing of the jacket and lifting of the 16,388 T topside for Huangyan 1-1 Project; lifting of the 850 T jacket and 490 T topside module for Indonesia BD Project; centralizing and lifting of four deepwater jackets with a total weight of 3,600 tons and lifting of four topsides with a total weight of 4,946 tons for Zawtika Project.

2016: lifting of seven topsides with total weight of 8,925 tons for Enping 18-1 WHPA Project; lifting of three topsides with total weight of 3,980 tons for Huangyan-Kongqueting WHPA Project.

2019: floating hose installation, subsea trenching, fit-up of bottom flanges of subsea hoses, connection between floating hose and SPM buoy for Hengyi (Brunei) Single Point Mooring (SPM) and Submarine Pipeline Systems EPC Project.

2021: lifting of the 840 T EPP jackets for Qinhuangdao 32-6 and Caofeidian 11-1 Oilfields Shore Power (shore power & expansion) Project; lifting of the 5,170 T module for Caofeidian 11-6 WHPK/L Module Project (shore power & expansion).