LAN JIANG | ||||
|
||||
Type: pipelay crane vessel Classification Society: ABS & CCS Length overall: 157.5m Molded breadth: 48m Molded depth: 12.5m Maximum draught: 8m Main crane: 3,800 T Capacity: equipped with strong mooring system of 12 high holding power (HHP) anchors, Lan Jiang’s lifting capacity is up to 3,800 T and covers 4.5”-36” (including coating layers) pipes laying in 6m to 150m-deep waters and 48” (including coating layers) pipes laying in 6m to 100m-deep waters. Main projects: 2003: jacket installation of South Korea East Sea #1; installation of the 3,500 T module for East Sea 1-1 Project. 2004: laying of subsea pipelines from Bonan 25-1 Oilfield to 28-1 Oilfield; installation of jacket for Lvda oilfield project,;installation of module for Caofeidian project. 2005: installation of the 2,850 T jacket and 1,500 T module for Lufeng 13-2 Project; installation of the 2,810 T jacket and module for Huizhou 21-1B Project. 2006: centralizing and installation of the 8,316 T jacket for Panyu 30-1 Project. 2012: installation of five jackets, five modules, and one jetty for Saudi Arabia KCROP Project. 2015: installation of one jacket and six modules for Brunei BSP Project; laying of subsea pipelines with a total length of 59 km for Burma ZAWTIKA Project. 2017: dismantling of four platforms and installation of three navigation aid platforms for Chevron’s project in Thailand. 2018: operations for Hengyi (Brunei) PMB Single Point Mooring (SPM) and Submarine Pipeline Systems EPC Project; laying of the 20” CRA insulated pipeline with concrete counterweights for Qatar NFA Project. 2020: laying of submarine pipelines with a total length of 21.22 km for Saudi Arabia CRPO-3648 Project; 2021: installation of 11 jackets and six modules for Hong Kong Offshore LNG Terminal Project; driving of S36# foundation piles for Zhanjiang Xuwen Offshore Wind Power Project and CGN Huizhou Port Phase I Offshore Wind Farm Project. |
||||
|
||||