HYSY 202 | ||||
|
||||
Type: pipelay crane vessel Classification: CCS Length overall: 168.3m Molded breadth: 46m Molded depth: 13.5m Maximum draught: 9m Main crane: 1,200 T Capacity: HYSY 202 has a maximum lifting capacity of up to 1,200 T and it can lay 4-60” single or double-node submarine pipes in 8 to 300m water depth. It is equipped with anchor mooring position systems. Main projects 2009: laying of submarine pipeline for Bonan Phase II Project, lifting of module for Caofeidian 18-1 Project. 2012: laying of submarine pipelines for Lishui 36-1 Project, slide launching of the 31,000 T jacket for Liwan 3-1 Project. 2013: float-over installation of the platform with the weight of 32,000 T for Liwan 3-1 Project. 2019: laying of submarine pipelines for Nigeria Dangote Project. 2021: laying of submarine pipelines for Hong Kong LNG Terminal Project. 2022: laying of the submarine gas transmission pipeline between Lvda 10-1 Oilfield and Suizhong 36-1 Oilfield. |
||||
|
||||