Deep-water multi-purpose vessel equipment

Crane and pipe-laying equipment

Construction site equipment

Trenching vessel equipment

ROV series equipment

Large launching barge equipment

Ocean engineering simulation equipment

Marine emergency maintenance and repair equipment

Underwater product development and testing equipment

Semi-submersible engineering vessel equipment

Trenching vessel equipment

HYSY 295

Type: novel dynamically positioned trenching vessel

Classification Society: DNV & CCS

Length overall: 95m

Molded breadth: 22.6m

Molded depth: 8.6m

Maximum draught: 6.2m

Main crane: 100 T

Capacity: The vessel is equipped with advanced systems and devices including full electric propulsion (FEP) system, all-direction propeller, DP2 system and 100 T jib crane with heave compensation mechanism and could be installed with mainstream trenching equipment such as self-propelled trencher, shallow water jet trencher and deepwater trencher. It has excellent performance in multiple operations like emergency repair of submarine pipelines, submarine cables laying and diving support.

Main projects:

2019: trenching for Bozhong 34-1 project.

2020: trenching for Penglai Area 4 Adjustment Project; post trenching for Bozhong 19-6 Condensate Gas Field Pilot Zone Development Project; Nanpu 35-1 Project and Caofeidian 6-4 Project; repair of submarine cables for Bonan Oilfield Project; removal of submarine obstacles for Nanpu 35-2 Oilfield.

2021: trenching and placement of pressing blocks for Lvda 6-2 Project.

2022: removal of fenders, garbage cleaning, diving support, and other operations for Bozhong 19-4 Oilfield Comprehensive Adjustment Project.