Project: Zhuhai LNG Terminal Project Phase II 

Time of completion: September 2024

Project introduction: Zhuhai LNG Terminal Project Phase II is expanded upon the foundation of the phase I project, with an expansion volume of 3.5 million tons per year. After expansion, the Zhuhai LNG terminal will have a total capacity of 7 million tons per year. COOEC undertakes the EPCIC of 5 full-containment concrete LNG storage tanks with a capacity of 270,000 cubic meter each.

Project highlights: Zhuhai LNG Terminal Project Phase II is the first storage tank with the largest capacity in the world of 270,000 cubic meters, which is undertaken by COOEC and independently designed by CGTank® core storage tank technology of CNOOC. The project is located in an area with a high seismic fortification level, currently making it one of the most complex geological conditions and the most challenging seismic design for liquefied natural gas storage tank projects in China.

  

  

     

     


About Us

Offshore Oil Engineering Co., Ltd. is a listed company controlled by China National Offshore Oil Corporation. It is the only large general contracting company in China with capacities to undertake the design, procurement, construction, offshore installation, commissioning and maintenance of offshore oil and gas development projects, as well as the liquefied natural gas, offshore wind power, refining and chemical projects, etc. It is also one of the largest and the most competitive EPCI (engineering, procurement, construction and installation) contractors of offshore oil and gas projects in the Asia-Pacific region. The Company is headquartered in Binhai New Area, Tianjin. It was listed on Shanghai Stock Exchange (Stock Short Name: COOEC, Stock Symbol: 600583) on February 2002.

Follow us on WeChat

© Copyright © Offshore Oil Engineering Corp CNOOC Ltd. Tianjin ICP NO.13005815-1 All Rights Reserved